University of Melbourne School of Engineering (MSE) Alterations

Office: Victoria
Sector: Tertiary
Value: $7.2M
Client: The University of Melbourne

Consultants:

Root Projects
DesignInc
Slattery Australia
Irwinconsult
Meinhardt Australia
McKenzie Group Consulting 

University of Melbourne School of Engineering (MSE) Alterations University of Melbourne School of Engineering (MSE) Alterations University of Melbourne School of Engineering (MSE) Alterations University of Melbourne School of Engineering (MSE) Alterations University of Melbourne School of Engineering (MSE) Alterations

Kane were appointed in September 2016 under a Construction Management contract to deliver the $7.2M University of Melbourne School of Engineering (MSE) Alterations.

The project scope consists of the following:

Engineering Workshop
- Decommission, relocate and store various items of workshop machinery
- New Linkway Corridor including demolition, structural upgrades to support new stair and glazed and metal screen partition, entry and outdoor works
- New 3D metal print and CAREN ‘Computer Assisted Rehabilitation Environment’ rooms
- Reinstall/install workshop machinery
- New lift
- New precinct Electrical MSB, new building MSB
- New mechanical services throughout including specialist extraction and ventilation for workshop machinery/CAREN
- New comms room including two new fibre connections to University network
- Localised demolition of internal walls, floor and roof
- New Corridor/amenities area to level one including new roof and floor
- New finishes throughout
- New amenities
- New fitout to student capstone spaces including student workspaces/meeting rooms, furniture and AV

Old Engineering School – North Wing Student Spaces
- Demolition of internal walls
- New steel structure to support removal of load bearing walls
- Structural stability works (earthquake mitigation)
- Expand existing central mechanical plant
- New fire sprinklers throughout
- Student work spaces and meeting rooms including furniture and AV

Old Engineering School
- Upgrade amenities on levels: ground, one and two
- Upgrade Central Courtyard
- Upgrade Caretakers Courtyard
- Upgrade Formula SAE Garage

This project will reach Practical Completion in the third quarter of 2017.